It is strongly recommended that the modules are installed on ceramic flooring. Tiling should
be done first and then the module installed and connected.
Services

The services required for installation are hot and cold water; 16amp power supply and a 300mm waste outlet. If the telephone
is to be used, a telephone extension line provision must be made.
Water Pressure

Hot and cold water supplies must be high pressure; 3 bar pressure. This is typically achieved by using one of the following
methods:
- Combination boiler
- Pressurised cylinder
- 3 bar pressurised negative head pump such as:
- Stuart Turner Monsoon
- Salamander ESP
CPV
Warranty

All Aromist steam showers are covered by a three year limited domestic warranty and a one year limited commercial warranty.